HIGHWAY BRIDGE
Drainage Services for the Newell Highway – New Dubbo Bridge Project
Client: Abergeldie Complex Infrastructure
Project: Newell Highway – New Dubbo Bridge, Macquarie River, NSW
Scope: CCTV Inspection, Asset Mapping, Jet-Vac Cleaning, Condition Reporting
Contractor: Draintech Solutions Pty Ltd
Date: 2025
The New Dubbo Bridge project—an essential infrastructure development spanning the Macquarie River—required expert drainage inspection, defect identification, and environmental sensitivity. Draintech Solutions was engaged by Abergeldie to deliver high-standard drainage services throughout the project lifecycle, from early asset condition surveys through to post-installation inspections.
Operating in floodplain terrain with strict environmental protocols, Draintech Solutions played a critical role in supporting the safe and timely delivery of this high-profile regional project.
1. CCTV Pipeline Inspection and Reporting
Draintech Solutions deployed its advanced CCTV robotic camera systems to inspect stormwater pipelines ranging from 40mm to 2100mm+ in diameter. These inspections included:
- Pre-construction dilapidation reports of existing pipelines.
- Final verification surveys of newly installed assets.
- Detection of cracks, joint displacements, and foreign debris.
All data was compiled into WinCan-compliant condition reports and high-resolution video logs, supporting real-time engineering decisions.
2. Stormwater Asset Mapping
By leveraging GIS-based mapping tools, Draintech Solutions developed accurate digital records of the stormwater network. This provided:
- Long-term reference points for future works.
- Asset traceability for project engineers and maintenance teams.
- Spatial alignment with bridge and road layouts.
3. Jet-Vac Drain Cleaning with Recycling Technology
Where debris was encountered, Draintech Solutions mobilised its state-of-the-art Jet-Vac Recycler Unit. This enabled:
- Onsite water recycling for continuous operation.
- Environmental compliance by minimising water runoff.
- Time-efficient pipe clearing ahead of CCTV inspections.
Working across floodplain terrain near the Macquarie River introduced environmental risks. Draintech Solutions:
- Avoided cultural heritage areas and sensitive zones during off-road operations.
- Implemented water containment controls to prevent runoff into the river system.
- Coordinated closely with environmental supervisors before, during, and after works.
Draintech Solutions maintained open communication and flexible scheduling with Abergeldie and other contractors throughout the project. This included:
- Rapid mobilisation of equipment and personnel in response to project needs.
- Onsite collaboration with engineers and pipelayers to resolve issues identified via CCTV.
- Strategic scheduling of drain cleaning ahead of inspections to maximise efficiency.
Draintech Solutions consistently applied industry-best technologies and processes:
- Robotic cameras with laser measurement capabilities.
- WinCan software for reliable digital reporting.
- Standards aligned with NATA accreditation and ISO-compliant systems.
Each project—regardless of size—is delivered with the same level of care, quality, and professionalism, and the New Dubbo Bridge was no exception.
Draintech Solutions helped ensure the long-term performance of critical stormwater infrastructure supporting the New Dubbo Bridge. Outcomes included:
- Preventative identification and resolution of drainage issues.
- Environmentally safe work practices across sensitive terrain.
- Reliable asset data to support the project’s ongoing maintenance and operational resilience.