SPI Rising Main M4-M5 Link Tunnels Project

Sydney Gateway Stage 1 & 3
JOHN HOLLAND SEYMOUR WHYTE (JHSW)
Civil and Infrastructure, Road and Rail

Drain repairs, CCTV inspections, confined space entry, UV lining and sectional repairs on the TfNSW site.

Sydney Metro City and Southwest -- Central Station
LAING O'ROURKE
Civil and Infrastructure, Rail, Government

Stormwater drainage remediation at Central Station using robotic cutting, UHPW, relining, jet blasting, and CCTV to resolve severe blockages and deliver as-built documentation.

WestConnex 3B Rozelle Interchange Project
CPB CONTRACTORS & JOHN HOLLAND
Tunnel Construction and Maintenance

Drainage services for tunnel construction, including cleaning, CCTV inspection, and maintenance support at the Rozelle Interchange.

Karratha Gas Plant Life Extension Project
CONTRACT RESOURCES
Oil, Gas and Mining

UV lining of mainline stormwater drainage infrastructure to support long-term operation at Karratha Gas Plant.

Western Sydney Airport Civil and Pavements Project
CPB CONTRACTORS & ACCIONA CONSTRUCTIONS
Civil and Infrastructure, Roads

Drainage CCTV inspections and repair works across airside civil and pavement areas at Western Sydney Airport.

SPI Rising Main M4-M5 Link Tunnels project
TRANSPORT FOR NSW
Civil and Infrastructure, Tunnel Construction

In 2022, Draintech Solutions became the first company in Australasia to deliver rehabilitation of a pressurised wastewater pipe with SAERTEX-LINER® MULTI Type S+XR.

Draintech Solutions took the innovative steps to reline more than 250 m of a recently installed pressurised wastewater pipe located inside the tunnel network infrastructure to increase the technical service life and future-proof the pipe against corrosion.

Newell Highway - New Dubbo Bridge
ABERGELDIE COMPLEX INFRASTRUCTURE
Civil and Infrastructure, Roads

The New Dubbo Bridge project—an essential infrastructure development spanning the Macquarie River—required expert drainage inspection, defect identification, and environmental sensitivity. Draintech Solutions was engaged by Abergeldie to deliver high-standard drainage services throughout the project lifecycle, from early asset condition surveys through to post-installation inspections.

Operating in floodplain terrain with strict environmental protocols, Draintech Solutions played a critical role in supporting the safe and timely delivery of this high-profile regional project.

Zetland
SPECIALIST HYDRO-DEMOLITION
Civil and Infrastructure

Draintech Solutions was engaged by the Client to undertake specialist hydro-demolition works at Zetland.

The scope involved the safe and precise removal of hardened concrete grout obstructing a stormwater drain using ultra high-pressure water jetting (UHPWJ) with a robotic cutter system.

These works formed a critical part of the broader remediation activities on site and required careful planning, skilled operation, and strict adherence to safety protocols due to the confined location, high-risk nature of the task, and proximity to other infrastructure and the general public/pedestrians.

Draintech Solutions’ methodology ensured efficient material removal while protecting the integrity of the host pipe and the public and complying with relevant standards and environmental controls.